Use the wall-mount included with the device, mount the device to the wall studs and confirm that the studs can support 92 lbs. of combined weight (board and wall mount), ensure device is placed in close proximity to power and...
All of the above Use Jamboard-provided stand, not a third-party stand Articulating wall mount and wall must be able to support load (92 lbs + VESA compatible adapter/mount) No horizontally embedded tabletop setups A battery should never be used in...
All of the above Ensure that physical installation standards are met Confirm device is powers on and boots to the whiteboard application properly Confirm device is provisioned, and customer sees the device JPanel Ensure the customer sign-off is complete
The display will be able to tilt downward and return to it’s original vertical position with ease The device will be able to pan, tilt, and scope with ease The display will be able to rotate 90° from landscape to...
By going to Settings>About Jamboard and tapping on “Build Number” 7 times. By going to Settings and tapping on “About Jamboard” 7 times. By long pressing the power button on the back of the Jamboard for 7 seconds. By going...
Usage of proxies should generally be avoided, as they add latency. Whenever possible to improve performance. To improve SSL inspection speed. If a wired connection is not available.